WisDOT to host I-94 East-West Freeway Project public meetings
The Wisconsin Department of Transportation (WisDOT) will host two public involvement meetings for the I-94 East-West Freeway Project.
Attend one of the public meetings
| Tuesday, June 25 4 p.m. to 7 p.m. Washington Park Senior Center 4420 West Vliet St., Milwaukee, 53208 |
Wednesday, June 26 4 p.m. to 7 p.m. Tommy Thompson Youth Center State Fair Park, Gate 5 640 S. 84th Street Milwaukee, WI 53214 |
The meetings will be held in an open-house format and provide an opportunity for the public to learn about the project, and updates to its design and schedule. Project representatives will be present to discuss the study on an individual basis. The same information will be provided at both meetings.
The meeting facilities are transit and wheelchair accessible. Those who would like an interpreter present at the meetings, or another accommodation, can contact WisDOT project representative Chris Zacharias at 262-548-6716, or I94EW@dot.wi.gov by June 17. Hearing impaired individuals needing assistance may contact the WisDOT representative via the Wisconsin Telecommunication Relay System (dial 711 and request to connect with 262-548-6716).About the I-94 East-West Freeway Project
The I-94 East-West corridor extends from just west of 70th Street to 16th Street on I-94 and from Blue Mound Road to just south of the Stadium Interchange on WIS 175/Brewers Boulevard. The purpose of the I-94 East-West Freeway Project is to address the deteriorated condition of I-94, obsolete roadway and bridge design, existing and future traffic demand, and high crash rate.
Additional information about the I-94 East-West Freeway Project can be found on the project website at wisconsindot.gov/94eastwest. Materials displayed and provided at the meetings will also be posted on the website.
NOTE: This press release was submitted to Urban Milwaukee and was not written by an Urban Milwaukee writer. While it is believed to be reliable, Urban Milwaukee does not guarantee its accuracy or completeness.
More about the I-94 East-West Expansion
- Transportation: 27th Street Bridge Closes Next Week - Graham Kilmer - Jan 26th, 2026
- Transportation: 27th Street Bridge Will Close For A Year - Graham Kilmer - Nov 29th, 2025
- Coalition Raises Concerns on I-94 Construction - Sierra Club - Nov 12th, 2025
- Construction Starting On $1.7 Billion Interstate 94 Widening - Jeramey Jannene - Oct 15th, 2025
- Governor Evers approves first segment of I-94 East-West construction to begin in Milwaukee County - Wisconsin Department of Transportation - Oct 15th, 2025
- Transportation: Fix At Six Coalition Sues State, Federal Government Over I-94 Expansion - Graham Kilmer - Aug 20th, 2024
- WisDOT to host I-94 East-West Freeway Project public meetings - Wisconsin Department of Transportation - Jun 12th, 2024
- Open Houses Announced For I-94 Widening - Jeramey Jannene - Jun 6th, 2024
- ‘Fix at Six’ Group Wants I-94 Expansion Delayed For Civil Rights Report - Jeramey Jannene - Mar 20th, 2024
- Coalition Admonishes I-94 expansion Record of Decision - Sierra Club - Mar 20th, 2024
Read more about I-94 East-West Expansion here
Mentioned in This Press Release
Recent Press Releases by Wisconsin Department of Transportation
WIS 241 Closed Near Root River in Milwaukee County Due to Flooding
Apr 17th, 2026 by Wisconsin Department of TransportationWIS 241 (27th Street) in the city of Frankin is currently closed due high water levels at the Root River. The Wisconsin Department of Transportation (WisDOT) encourages drivers to be aware of changing travel conditions. “Know before you go” with 511 Wisconsin, 511wi.gov or via the free app, to view highway closures impacted by flooding and weather alerts across the state. Current highway closure: Milwaukee County WIS 241 (27th Street) near the Root River is closed in both directions, Milwaukee County The timeline for reopening these roads remains unknown, as river levels are still cresting, and additional rain is anticipated. WisDOT officials are closely monitoring the roads and river levels and will reopen them as soon as it is safe to do so. While it’s difficult to predict if or where flooding may occur, WisDOT offers these tips: Flooding conditions may change rapidly so drive with caution at all times. Never drive through standing water or around barriers. As the safety slogan goes, “Turn Around, Don’t Drown!” It only takes a foot of rushing water to sweep away or float most cars and just two feet of rushing water can carry away SUVs and trucks. Just six inches of floodwater will reach the bottom of most passenger cars, causing loss of control and possible stalling. Stay alert and slow down. Follow designated detour routes if state, county and local roads experience flooding. If you must travel, check 511 Wisconsin for the latest information on any road closures or impacts.











