Construction Continues Despite Snow
As the city slipped and slid around from multiple inches of snow and ice dumped on it in recent days, construction crews continued building our city. Down on Water St. at The Residences on Water site men scrambled to remove snow from the roof while a crane lifted large beams into place. It appears the ER Post Structural System does allow them to build quickly as had been indicated. In fact fast enough that a line of semi’s sit with their engines running across the street from the site waiting their turn to unload the next beam.