Jeramey Jannene
Friday Photos

Construction Underway at The North End

Mandel Group is building the third phase of their "neighborhood by design" -- to plug "the doughnut hole in Downtown."

By - Dec 5th, 2014 04:04 pm

Mandel Group is building the third phase of their "neighborhood by design" -- to plug "the doughnut hole in Downtown." Back to the full article.

Photos - Page 3

4 thoughts on “Friday Photos: Construction Underway at The North End”

  1. Rich says:

    Surely the Riverwalk section is bigger than 420 sq ft, right? That’s only 10ft x 42ft or 5ft x 84ft and I think the river frontage is longer than either of those.

  2. @Rich – Many orders of magnitude bigger. It’s 420 feet long. Error on my part.

  3. john norquist says:

    Congrats to Mayor Tom Barrett and Barry Mandel. This project fills the space between the Beer Line/Lower East Side neighborhoods and Downtown. The walk along the Milwaukee River to North Avenue and the natural beauty beyond will now be much more attractive.

  4. You are quite right Mr. Former Mayor Norquist.You Ginitiated the Riverwalk development mandate early in your tenure. You framed it as an essential componentof the development of urban Milwaukee.Said it wouldtake more than a decade to complete.
    You made these remarks at the dedication of the first segment constructed during your term, which also bears the first plaque with your name engraved thereupon in your capacity as mayor.

Leave a Reply

You must be an Urban Milwaukee member to leave a comment. Membership, which includes a host of perks, including an ad-free website, tickets to marquee events like Summerfest, the Wisconsin State Fair and the Florentine Opera, a better photo browser and access to members-only, behind-the-scenes tours, starts at $9/month. Learn more.

Join now and cancel anytime.

If you are an existing member, sign-in to leave a comment.

Have questions? Need to report an error? Contact Us